TAG ARCHIVE

liquidated damages

Articles, briefings, and analysis connected to this topic.

F404-IN20 Engines Delivered as GE Ships 3 to HALDEFENCE INDUSTRY

F404-IN20 Engines Delivered as GE Ships 3 to HAL

GE Aerospace shipped three more F404-IN20 engines to HAL in August, a fraction of the 20 engines it assured for the Tejas Mk1A programme by December, as HAL invokes penalty clauses over the ongoing shortfall.

3/9/2026 | TAGGED REPORT