DEFENCE INDUSTRY BRIEFINGS
TAG ARCHIVE
Articles, briefings, and analysis connected to this topic.
HAL has 22 finished Tejas Mk1A fighters that cannot be delivered for want of engines. At Farnborough, CMD Ravi K sat down with GE Aerospace chief Larry Culp and came away with a commitment of 22 F404-IN20s before the year is out, alongside a firmer window of March to July 2027 for the LCA Mk2 first flight.